(1)
METHODOLOGICAL PRINCIPLES OF CALENDAR PLANNING BY PROBABILISTIC CHARACTER OF CONSTRUCTION. znp 2018, 1 (50), 263-269. https://doi.org/10.26906/znp.2018.50.1084.