(1)
PREPARATORY STAGE FOR MONITORING THE LOAD-BEARING STRUCTURES OF THE OPERATED SUBWAY STATION. znp 2017, 2 (49), 116-125. https://doi.org/10.26906/znp.2017.49.832.