DRILL INJECTED TECHNOLOGY APPLICATION EXPERIENCE FOR THE PURPOSE OF GROUND REINFORCEMENT AND PILE ERECTION DURING RECONSTRUCTION. (2017). Academic Journal Industrial Machine Building Civil Engineering, 2(49), 45-53. https://doi.org/10.26906/znp.2017.49.823