PREPARATORY STAGE FOR MONITORING THE LOAD-BEARING STRUCTURES OF THE OPERATED SUBWAY STATION. (2017). Academic Journal Industrial Machine Building Civil Engineering, 2(49), 116-125. https://doi.org/10.26906/znp.2017.49.832