“PREPARATORY STAGE FOR MONITORING THE LOAD-BEARING STRUCTURES OF THE OPERATED SUBWAY STATION”. 2017. Academic Journal Industrial Machine Building Civil Engineering 2 (49): 116-25. https://doi.org/10.26906/znp.2017.49.832.