“PREPARATORY STAGE FOR MONITORING THE LOAD-BEARING STRUCTURES OF THE OPERATED SUBWAY STATION” (2017) Academic journal Industrial Machine Building Civil Engineering, 2(49), pp. 116–125. doi:10.26906/znp.2017.49.832.