[1]
“PREPARATORY STAGE FOR MONITORING THE LOAD-BEARING STRUCTURES OF THE OPERATED SUBWAY STATION”, znp, vol. 2, no. 49, pp. 116–125, Oct. 2017, doi: 10.26906/znp.2017.49.832.